Scheduled Maintenence

Dec 01 at 09:00am GMT  –  Dec 01 at 03:00pm GMT
Affected services
Priorite
Koboh Client Area
Koboh Website

Resolved
Dec 01 at 09:00am GMT

On Sunday, December 1st, at 9 AM, our London Data Centre provider will perform essential maintenance to one of the power feeds to our data hall. This will only impact one of the two power feeds in our data hall. However, as all our equipment is configured with redundant power (multiple power supplies in each server and switch), no impact is expected other than to consider our services at risk for the duration of the maintenance window.

As a precaution, our server provider will have staff on-site during the maintenance window. The expected completion time is 3 PM; however, we will confirm once the work has been completed.